Due to the geometry of the main roof, this was a unique challenge. The roof was angled on multiple planes, with a movement joint located directly where the temporary roof was to be erected.
Considerations had to be made regarding the flexibility of the temporary roof, due to the location of the required fixings. Under no circumstances could the temporary roof act as a rigid structure, as this would be detrimental to the main roof. There were four different tie configurations on this scaffold alone, purely to accommodate the required movement.
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad4.jpg)
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad3.jpg)
![Etihad Stadium, MCFC](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad5.jpg)
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad2.jpg)
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad6-672x430.jpg)
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/etihad1-672x430.jpg)
Related Projects
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/Temporary-Roof-Cover-672x430.jpg)
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2024/11/13jpg_1600x1200px-900x580-1-672x430.jpg)
Nuneaton Railway Station
![Manchester Engineering Campus Development](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/NFRY4345-672x430.jpg)
Manchester Engineering Campus Development
![1500mm Deep Beam Span](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/IMG_3204-e1595845871843-672x430.png)
John Dalton St, Manchester City Centre
![Image of a building with scaffolding professionally erected.](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/1-2-672x430.jpg)
100 Embankment, Manchester City Centre
![Freestanding Beamed Access](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/Untitled-3-672x430.jpg)
Rosebush Reservoir, South Wales
![Atrium Access](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/DSC_7722-1-672x430.jpg)
Manchester Engineering Campus Development
![Circle Square, Manchester City Centre](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/circle-sqaure2-672x430.jpg)
Circle Square, Manchester City Centre
![](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/Castle-Coch-Cardiff-2-1-672x430.jpg)
Castle Coch, Cardiff
![Temporary Roof Cover](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/153c45ee-d8cb-435f-9faf-b7374fd070f2-1-672x430.jpg)
Autism Centre, Bolton
![Sir Charles Grove, Manchester City Centre](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/prj1-672x430.jpg)
Sir Charles Grove, Manchester City Centre
![Temporary Roof Cover](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/standen-672x430.jpg)
Standen Hall, Clitheroe
![St Pauls Church, Shaw](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/church5-672x430.jpg)
St Pauls Church, Shaw
![Temporary Roof Cover & Pavement Gantry](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/uni-of3-672x430.jpg)
University of Manchester
![Bolton Sixth Form College, Bolton](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/bolton-672x430.jpg)
Bolton Sixth Form College, Bolton
![Manchester Central Library](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/1-672x430.jpg)
Manchester Central Library
![Manchester Airport](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/airport5-672x430.jpg)
Manchester Airport
![Ulverston Manor, Cumbria](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/roof9-672x430.jpg)
Ulverston Manor, Cumbria
![Midlands](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/midlnads4-672x430.jpg)
Midlands
![Lowry Mill, Manchester](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/lowry3-672x430.jpg)
Lowry Mill, Manchester
![blackpool city centre](https://www.buckleydesigns.co.uk/wp-content/uploads/2020/07/blackpool8-672x430.jpg)