Scaffolding design services Manchester

Call: 0800 270 7998

Bolton College

The front and side supporting scaffolds were erected from ground level, with the rear elevation supported from a succession of towers. The support towers were erected on load bearing locations across the main roof structure. They were secured to the roof using resin ties (to counteract uplift), and spine beams were used to connect each tower. The overall span of the Ubix temporary roof system, at its furthest point was 26m.

  • bolton2.jpg
    Temporary Roof
  • bolton3.jpg
    Temporary Roof
  • bolton1.jpg
    Temporary Roof